BAKU-TBILISI-CEYHAN CRUDE OIL PIPELINE PROJECT, CEYHAN MARINE PROJECT, JETTY CONSTRUCTION 

LOCATION: CEYHAN / TURKEY

CLIENT: TEKFEN Construction and Installation Co. Inc.

COMPLETION DATE: 30/04/2005

PROJECT DESCRIPTION:

Overall lenght is 2600 m

1 ea fire replenishment building,1 ea control building

1 ea loading RC platforms,4 ea berthing dolphins

9 ea mooring dolphins 

Supply and mobilization of equipment 

Test pile driving 

D1524/t19.1 mm steel pipe pile driving

D1220/t19.1 mm steel pipe pile driving

D914/t16 mm stell pipe pile driving

Securing driven piles

Formwork and scaffolding of marine structure

Reinforced steel works of superstructure

Concreting works for super structure