BAKU-TBILISI-CEYHAN CRUDE OIL PIPELINE PROJECT, CEYHAN MARINE PROJECT, JETTY CONSTRUCTION
LOCATION: CEYHAN / TURKEY
CLIENT: TEKFEN Construction and Installation Co. Inc.
COMPLETION DATE: 30/04/2005
PROJECT DESCRIPTION:
Overall lenght is 2600 m
1 ea fire replenishment building,1 ea control building
1 ea loading RC platforms,4 ea berthing dolphins
9 ea mooring dolphins
Supply and mobilization of equipment
Test pile driving
D1524/t19.1 mm steel pipe pile driving
D1220/t19.1 mm steel pipe pile driving
D914/t16 mm stell pipe pile driving
Securing driven piles
Formwork and scaffolding of marine structure
Reinforced steel works of superstructure
Concreting works for super structure