ISKENDERUN SUGOZU IMPORTED COAL FIRED POWER PLANT (Coal Unloading Jetty)

LOCATION: ADANA / TURKEY

CLIENT: GAMA-TEKFEN Joint Venture

COMPLETION DATE: 14/05/2002

PROJECT DESCRIPTION:

The overall lenght of pier is 778.8 m

592 m in lenght,

7.8 m in widht with steel piles 

Dia: 32'' 164 ea and Dia:24'' 12 ea steel pile with total lenght of 9560 m

6 ea dolphins 60 ea in total steel pile,1 ea dolphin 8 ea steel pile,1 ea dolphin 6 ea steel pile 

3641 m3 concrete, 3724 m2 formwork, 56 ton RC rebar 

130 ea provision and installation of rubber fender