top of page
cesport_logo_Son.jpg

 

THE REPAIR AND STRENGTHENING 0F 30

BRIDGES AND VIADUCTS 

 

LOCATION:  MACEDONIA

CLIENT: NATO Maintenance and Supply Agency (NAMSA)

COMPLETION DATE: 31/12/2007

PROJECT DESCRIPTION:

Repair and Strengthening of 30 ea motorway bridges and viaducts (2363mt)

Repair and Strengthening calculation and design 16 of 30 bridges and viaducts

R.F Jacketing over columns, cross girders and longitudinal girders

Strengthening of slabs by carbon-fiber

Construction of additional sheet walls

Strengthening of slabs by micro-reinforced concrete

Epoxy injection

Three layer elastomeric protective coating over finished concrete surfaces

New bridge insulation system and polimer modified asphaltic concrete pavement

Provide and install New-Jersey type guard-rails 

Upgrading surface drainage system

 

​

​

​

bottom of page