top of page

THE REPAIR AND STRENGTHENING 0F 30
BRIDGES AND VIADUCTS
LOCATION: MACEDONIA
CLIENT: NATO Maintenance and Supply Agency (NAMSA)
COMPLETION DATE: 31/12/2007
PROJECT DESCRIPTION:
Repair and Strengthening of 30 ea motorway bridges and viaducts (2363mt)
Repair and Strengthening calculation and design 16 of 30 bridges and viaducts
R.F Jacketing over columns, cross girders and longitudinal girders
Strengthening of slabs by carbon-fiber
Construction of additional sheet walls
Strengthening of slabs by micro-reinforced concrete
Epoxy injection
Three layer elastomeric protective coating over finished concrete surfaces
New bridge insulation system and polimer modified asphaltic concrete pavement
Provide and install New-Jersey type guard-rails
Upgrading surface drainage system
​
​
​






1/2
bottom of page