AGALAR HARBOUR CONSTRUCTION AND INSTALLATION WORKS

LOCATION: MERSİN / TURKEY

CLIENT: Ministry of National Defence,

NATO Infrastucture Department 

COMMENCEMENT DATE: 07/07/2000

COMPLETION DATE: 24/05/2003

PROJECT DESCRIPTION:

350 m in length,

50 in width with steel piles having reinforced concrete slab berthing jetty 

120 m in length, 20m in width with steel piles having reinforced concrete slab connection jetty, 5787 m3 excavation, 5140 m3 fill, 57649 m3 concrete

13521 m dia: 1200 mm pile driving,

32447 m2 formwork,

61922 ton rubble mound,

135 ea provision and installation of ruber fender.

 

​