CONSTRUCTION OF UZUNADA POL PIER AND DOLPHINS, RESTORATION OF MINE PIER

LOCATION:  İZMİR / TURKEY

CLIENT: NATO

COMPLETION DATE: 24/05/2003

PROJECT DESCRIPTION:

350 m in length, 50 m width with steel piles having reinforced concrete slab berthing jetty

120m in length, 20 m in width with steel piles having reinforced  concrete slab connection jetty

5787 m3 excavation, 5140 m3 fill, 57649 m3 concrete, 13521 m dia:1200mm pile driving

32447 m2 formwork

61922 ton rubble mound 

135ea provision and installation of rubber fender